Crane/Davit for Pipe-laying Work
The structure of davit includes derricking gear, lifting mechanism, host organization, hydraulic station and electric control system. This davit could be lauched steadily and controlled easily. It could also reduce production costs, hence meeting the requirement of offshore pipe-laying ship work.
Maximum Lifting Weight (t) |
60 |
Maximum Pendulum Deflection of Davit Arms(°) |
22 |
Figure Sizes (mm) |
6844 (Height)*3980 (Width)*5073 (Length) |
Weight of Davit (t) |
18.82 |
Maximum Wind Force (grade) |
8 |
Maximum Wind Pressure (Pa) |
250 |
Tilt Angle of the Ship Body (°) |
Crossfall 5, rake 2 |
|